Last Changed 1/14/2010
|
The floor tiles were finished just in time as the custom made cabinets we ordered arrived on December 18th, 2009.
|
click on images to enlarge |
 |
A room full of cabinets. |
 |
Dale and Mark have to finish the cabinets. |
click on images to enlarge |
 |
|
 |
|
click on images to enlarge |
 |
Dale chose to use Tung oil on the maple wood rather than
staining it. |
 |
The first coat of Tung oil. |
click on images to enlarge |
 |
|
 |
|
click on images to enlarge |
 |
Three coats of Tung oil. The cabinets are waiting to be
installed. |
On December 23rd, 2009, the cabinets were installed. Now Dale has to select the counter
tops.
|
 |
This is the cabinet that will hold the sound system and the satellite receiver. The LCD TV will be on an arm above the
cabinet.
We had a triangle table built to sit next to the chair that will be placed off the end of the sound system cabinet. |
 |
The bar cabinets. |
click on images to enlarge |
 |
An under counter refrigerator will be in the space on the right.
The drawer is missing on the left because of a design flaw where Mark put the electrical receptacle for the water heater
interfered
with the drawer. The cabinet maker will shorten the drawer. |
 |
The space on the right of the upper cabinets if for the microwave. |
 |
One of the details we liked in our cabinets was that the raised panel was done on the inside of the door as well as the outside.
Usually raised panel doors are raised only on the outside. |
click on images to enlarge |
 |
The cabinet maker did an excellent job building the cabinets.
Note the full extension drawer slides. |
 |
This cabinet is mounted over the toilet. |
click on images to enlarge |
 |
The vanity cabinet.
There are drawers on the bottom. |